Case
Histories - Sliplining Helps Restore Deteriorated Sewer Lining
Officials
with the city of Elyria, Ohio, in 1997 discovered a concrete sewer line serving
a local industrial park was failing. The line had been installed in the early
1980s with what was projected to be a design life of 40 to 50 years. Despite being
coated with bituminous epoxy, most of the pipe had suffered deterioration, in
some places up to 50 percent. The
line includes more than 6,600 feet of pipe, with large sections under residential
streets. From the city's perspective, replacing the line would have been cost
prohibitive because of the expense of removing the existing line and installing
anew one. The city also wanted to avoid disrupting newly paved and upgraded streets
in the area. Elyria officials opted to use trenchless technology to rehabilitate
the sewer in two phases, the first of which involved 3,800 feet of 48-in. slipliner
going into 54-in. diameter concrete pipe and 250 feet of 42-in. slipliner going
into 48-in. concrete pipe. The city reviewed different types of trenchless technologies
and sought bids on slip liners and cured-in-place pipe. The bids were received
on Nov. 20, 1997. The low bidder, Triad Engineering and Contracting Co. of Walton
Hills, Ohio, submitted the successful low bid using Vylon Slipliner Pipe.
The Vylon pipe is chemically resistant to items often found in sanitary and
storm sewers, and, at 46 psi, its high stiffness and structural strength provide
the same performance as a new pipe. It is lighter in weight than fiberglass and
polyethylene liners and is more versatile in the field. This was a crucial element
in the Elyria project because there were several tight radius curves. Sliplining
these curves was possible because of company's ability to manufacture the liner
in lengths as short as 2.5 feet. Segmented Feature Simplifies Installation
Vylon pipe is segmental and eliminates the need to stop the flow of sewage
completely or initiate any bypass pumping during installation. The segmental liner
requires smaller insertion pits when compared to continuous liner pipe.
Another benefit of sliplining is that a variety of general and tunneling contractors
can install the pipe in contrast to cured-in-place systems that require specially
licensed contractors. Because most experienced underground contractors can learn
to work with slipliner, more companies can bid on projects. This will ultimately
lead to a more competitive bid. On the Elyria project, the lower bidder,
Triad Engineering and Contracting, used the product for the first time. To aid
Triad in understanding some of the nuances of sliplining, Lamson provided field
personnel at the job startup. These personnel periodically visited the job site
to offer any additional assistance requested. Work on the first phase
began in May 1998 and was completed in August 1998. The second phase
involved rehabilitation of 2,200 feet of 60-in. concrete pipe with 54 in. slipliner,
and approximately 620 feet of 54-in. concrete pipe with 48-in. slipliner. Construction
began in September 1998 and was completed in early November 1998. The project
was the first to use Vylon's 54 in. diameter slipliner. The company
recently expanded into this size range to accommodate the larger diameter pipes
typically found in major public or private sewer systems. In each phase,
Triad began the installation process by using high pressure water cleaning to
remove debris from the existing lines. At designated points throughout the job
site, insertion pits 20 feet wide by 30 feet long were excavated and the host
pipe was cut at springline. The bottom half of the pipe was left in place to form
a channel for placement of the sliplining pipe. After preparation of
the insertion pit, the first piece of slipliner was placed in the channel and
inserted by pushing. The insertion method involves a push ring attached to a pulley
system. This system is used to evenly distribute the jacking forces on the pipe.
After insertion, the first piece was held in place and joined with the next section.
The joint system uses a flush bell and a gasketed coupling that provides a water
tight seal. This procedure of restraining, joining and insertion was repeated
until an entire section was lined. Triad repeatedly lined between 600 to 900 feet
from a single insertion pit. Upon completing the installation, bulkheads
were built at the manholes to keep the flow out of the space between the concrete
pipe and the slipliner. The annular space was then grouted to secure the slipliner
pipe in place and prevent point loading of the host pipe continued to deteriorate.
Testing of the line occurred in early 1999, and the project was deemed a
success. Construction was completed with minimal disruptions to public streets
and the operation of the municipal sewer system. |